On 27 November 2026, the Indian Navy received Vindhyagiri (Yard 3024) from Garden Reach Shipbuilders and Engineers Limited (GRSE), Kolkata. It is the seventh and final Nilgiri-class frigate under Project 17A, marking the completion of all seven ship deliveries under the programme.
About Project 17A
Project 17A is an Indian Navy programme to build seven advanced, multi-mission stealth frigates as an improved successor to the Shivalik-class (Project 17) frigates.
- The ships are designed by the Warship Design Bureau of the Indian Navy, with construction shared between two defence shipyards: four by Mazagon Dock Shipbuilders Limited, Mumbai, and three by GRSE, Kolkata.
- GRSE operates under the Ministry of Defence and is a major public-sector shipbuilding enterprise.
- The multi-mission platforms are equipped with an advanced suite of weapons and sensors, enhancing their capabilities across anti-surface, anti-air and anti-submarine warfare domains.
- They also feature Combined Diesel or Gas (CODOG) propulsion systems, comprising a diesel engine and a gas turbine, along with an Integrated Platform Management System.
About Vindhyagiri
- Vindhyagiri showcases the design, ship construction and engineering prowess of the nation and reflects the Indian Navy’s unrelenting focus on Aatmanirbharta.
- Named after the Vindhyagiri mountain range in Karnataka, the frigate is a reincarnation of the erstwhile INS Vindhyagiri, a Leander-class frigate.
Key Features and Capabilities
- Stealth technology reduces the ship’s visibility to enemy radar, making detection more difficult.
- Multi-dimensional warfare capability enables operations against enemy aircraft, surface warships and submarines.
- Combined Diesel or Gas propulsion uses diesel engines for efficient cruising and gas turbines for higher speed.
- The ship has an Integrated Platform Management System, which helps monitor and manage important onboard machinery and systems.
- Its advanced weapons and sensors strengthen India’s maritime defence capabilities.
Significance for India
- All seven frigates were delivered within 23 months of the first ship, INS Nilgiri, delivered in December 2024.
- Vindhyagiri’s construction period was reduced to 68 months, compared with 84 months for the first ship.
- The programme has 75% indigenous content, involved more than 200 micro, small and medium enterprises, and generated approximately 4,000 direct and over 10,000 indirect jobs.
- It strengthens Aatmanirbhar Bharat by promoting indigenous warship design, manufacturing and defence supply chains.
Exam Hook – Key Takeaway: Project 17A demonstrates India’s growing capability in indigenous stealth warship design and construction, strengthening maritime security and defence self-reliance.
Start Yours at Ajmal IAS – with Mentorship StrategyDisciplineClarityResults that Drives Success
Your dream deserves this moment — begin it here.


