India’s New CAPEX Support Scheme for Critical Minerals
1. Why India Needs This Scheme
- Heavy Import Dependence: Global refining of lithium, nickel, and cobalt is controlled by very few countries (mainly China), leaving India vulnerable to supply cuts and price spikes.
- High Setup Cost: Turning raw mineral ore into pure, battery-grade material requires costly technology and strict pollution control. Government funding makes these expensive projects financially viable for private companies.
2. Scheme Targets & Financial Support
Running for 5 years (FY 2026–27 to FY 2030–31), the scheme gives a 30% capital subsidy to attract around ₹10,000 crore in private investment:
- Lithium Refining (2 Plants): Converts hard-rock ores (excluding salt-flat brines) into battery-grade lithium. Minimum capacity of 30,000 tonnes per plant (60 kt total by 2030), with a subsidy limit of ₹500 crore per plant.
- Nickel Refining (2 Plants): Produces Class-1 nickel or battery-grade nickel sulphate (with cobalt recovered as a by-product). Minimum capacity of 50,000 tonnes per plant (100 kt total by 2030), capped at ₹900 crore per plant.
3. How Companies Are Selected & Paid
- Two-Stage Bidding: Companies first clear a technical check, then compete in a financial bid where the company asking for the lowest subsidy (least-cost method) wins.
- 3-Stage Payout: Plants must start within 3 years (subsidy reduces if delayed up to 5 years). Money is paid in 3 steps: 25% on initial investment, 50% midway, and 25% once the plant starts working.
Practice MCQ
Q. Consider the following statements regarding the CAPEX Support Scheme for Critical Mineral Processing:
- The scheme provides a 30% capital subsidy funded through Central Government budgetary support to set up domestic refining plants.
- The scheme explicitly covers and subsidizes brine-based lithium extraction alongside hard-rock ore processing facilities.
Which of the statements given above is/are correct?
(a) 1 only (b) 2 only (c) Both 1 and 2 (d) Neither 1 nor 2
Hint: Statement 1 is correct; the scheme gives a 30% capital subsidy (up to ₹500 crore for lithium and ₹900 crore for nickel) funded by the Centre. Statement 2 is incorrect because the scheme excludes brine-based lithium extraction and only covers ores and concentrates.